Partitions are usually the biggest item in an office reinstatement. The type of wall decides how it comes out, and what has to be made good afterwards.
Updated 26 October 2026
In short: Drywall (gypsum board) partitions are the quickest to remove; glass partitions need careful dismantling; block or brick walls need hacking and create the most debris. After removal, the ceiling, floor and walls where the partition met them usually need making good, and any wiring, data points and fire safety devices in the wall must be dealt with properly.
| Partition | How it’s removed | Debris and noise |
|---|---|---|
| Drywall (gypsum board on metal studs) | Boards stripped, studs and tracks unscrewed | Low to moderate |
| Glass partition | Panels and frames dismantled; glass handled with care | Low, but heavy and fragile |
| Demountable system partition | Unclipped and removed panel by panel | Low |
| Block or brick wall | Hacked out, then debris bagged and hauled | High; may need noisy-work slots |
Whether the landlord wants bare shell or original condition decides how much making good is needed.
Drywall partitions in a small office can often come down in a day or two. Larger offices, glass systems or block walls take longer, especially when building management limits noisy works to certain hours. See how long office reinstatement takes.
We handle office reinstatement across Singapore, with a free site survey and an itemised quotation. See office reinstatement, or WhatsApp us photos of the unit.
Send photos, the floor plan and your handover date. Site surveys are free and every quotation is itemised.
Can’t see yours? Send it on WhatsApp with a photo of the unit.
Drywall partitions in a small office often take a day or two. Glass systems, block walls and larger offices take longer.
You usually need building management approval and work permits. If fire safety devices are affected, SCDF approval may also apply.
Only if the landlord agrees in writing. Otherwise most leases require tenant-installed partitions to be removed.
Ceiling boards where the partition ran are usually patched or replaced so the ceiling is continuous at handover.
We’ll reply with an initial estimate and a time for a free site survey.