Home / Hacking services
Wall, floor tile, screed and built-in removal for homes and commercial units, with approvals checked upfront and disposal included.
In Singapore, “hacking” means breaking out and removing walls, floor tiles, wall tiles, screed and built-in structures, usually as the first stage of a renovation or as part of reinstatement.

HDB controls hacking work in flats closely. Before any wall is hacked:
We tell you upfront whether a wall can be hacked and what approvals your job needs. For condos, the management corporation usually has its own renovation rules and deposit.
For offices, shops, warehouses and factories, hacking is often part of a larger strip-out or reinstatement job: removing block walls, toilets, kitchens, floor finishes or old platforms. We plan the works around building management rules and working hours.
Hacking is usually priced per job after a site visit, based on the area, the material (brick and concrete take longer than drywall), access, and disposal volume. Send photos of the walls or floors and the unit type on WhatsApp for an initial estimate.
| Job | What’s removed | Typical time |
|---|---|---|
| Toilet hacking | Wall and floor tiles, screed, vanity and fittings, down to the waterproofing layer or slab | 1–2 days per toilet |
| Kitchen hacking | Wall and floor tiles, cabinets, platform and sink; non-structural wall if approved | 1–3 days |
| Floor tile hacking | Tiles and screed across living areas and bedrooms | 2–4 days for a typical HDB flat |
| Wall hacking | Non-structural brick, block or drywall walls, fully or to make an opening | 1–2 days per wall |
| Commercial hacking | Block walls, toilets, pantries, platforms and floor finishes in offices, shops and warehouses | Planned around building rules |
Times are for the hacking itself and depend on area, material and access. Detail by job: kitchen hacking and hacking floor tiles.
| HDB flat | Condo | Commercial unit | |
|---|---|---|---|
| Approval | HDB permit through a DRC-listed contractor | Management corporation approval and deposit | Landlord or building management; BCA or SCDF if the works need it |
| Noisy work hours | 9am–5pm, weekdays only | Set by the condo’s by-laws | Set by the building; malls often after trading hours |
| Key limits | No structural walls; 3-year rule for wet areas | No structural walls; by-law limits | Fire safety and building rules |
More on the HDB side: HDB renovation guidelines and the HDB permit for hacking. For commercial approvals, see A&A works.
Send photos, the floor plan and your handover date. Site surveys are free and every quotation is itemised.
Can’t see yours? Send it on WhatsApp with a photo of the unit.
No. Structural walls and the beams above them cannot be removed. Non-structural walls can usually be hacked with the right approvals; we check before quoting.
Yes. Bagging, haulage and disposal are included in the quotation.
A typical HDB flat’s floor tiles can often be hacked in 2–4 days, depending on area, screed thickness and access.
Yes. We cover floors, doors and fittings that stay, and control dust as far as practical.
No. Noisy works such as hacking are only allowed from 9am to 5pm on weekdays, and not on weekends or public holidays.
Usually one to two days per toilet for the hacking itself, depending on the tile layers and access.
We’ll reply with an initial estimate and a time for a free site survey.