Kitchen hacking usually means removing old wall and floor tiles, a kitchen wall, or both. Here’s what HDB allows, and how the work runs on site.
Updated 26 October 2026
In short: In HDB flats, kitchen wall and floor tiles can't be replaced in the first three years after the block's TOP, because the kitchen is a waterproofed wet area. After that, hacking tiles needs HDB approval through a registered contractor, the new floor finish and screed can't exceed 50mm, and only non-structural kitchen walls can be removed with approval.
| Rule | What it means for your kitchen |
|---|---|
| 3-year wet area rule | Kitchen wall and floor tiles can’t be replaced within three years of the block’s TOP |
| Approval for hacking tiles | Removing existing tiles, rather than overlaying, needs HDB approval through your registered contractor |
| 50mm floor limit | New floor finish and screed together can’t exceed 50mm |
| Kitchen walls | Only non-structural walls can be removed, and only with approval |
| Gas pipes | Leave gas pipes alone; plan cabinets around them |
Before three years, you can overlay new tiles or vinyl on the existing floor instead of hacking. See the full HDB renovation guidelines and the HDB permit guide for hacking.
A typical HDB kitchen’s tile hacking is usually one to three working days, depending on the area, number of layers and whether a wall comes down. Noisy works are capped at three consecutive days, so larger jobs are split. More on timing in HDB renovation timing.
Condos follow their management corporation’s renovation rules rather than HDB’s. Expect a renovation deposit, set working hours and lift protection requirements, so check the by-laws before booking.
Price depends on floor and wall area, number of tile layers, screed thickness, whether a wall is removed, access and debris disposal. See hacking floor tiles: cost and time, or send photos for a fixed quote.
We handle kitchen hacking across Singapore, with a free site survey and an itemised quotation. See kitchen hacking, or WhatsApp us photos of the unit.
Send photos, the floor plan and your handover date. Site surveys are free and every quotation is itemised.
Can’t see yours? Send it on WhatsApp with a photo of the unit.
Not in the first three years after the block’s TOP, because the kitchen is a waterproofed wet area. You can overlay new tiles or vinyl instead.
Yes. Removing existing tiles needs HDB approval, which your HDB-registered contractor applies for.
Only if it is non-structural and HDB approves it. Structural walls can’t be removed.
Usually one to three working days for a typical HDB kitchen, within the 9am–5pm weekday window for noisy works.
We’ll reply with an initial estimate and a time for a free site survey.