Hacking out old floor tiles is commonly quoted at about S$3 to S$8 per sq ft including disposal. Here’s what drives the price, how long it takes, and when you can skip it.
Updated 26 October 2026
In short: Hacking out floor tiles in Singapore is commonly quoted at about S$3 to S$8 per sq ft including disposal, plus S$1 to S$3 per sq ft if the slab needs screeding. A typical HDB flat takes two to four working days, within HDB's weekday 9am–5pm noisy-work hours.
Prices are indicative ranges from published Singapore guides, not a quotation. A site visit is needed for a firm price.
Singapore guides put hacking and disposing of an existing hard floor at roughly S$3 to S$8 per sq ft. If the slab needs re-levelling before new flooring, screeding adds about S$1 to S$3 per sq ft. Homes are often quoted per job rather than per sq ft.
A typical HDB flat’s floor tiles can often be hacked in two to four working days, depending on the area, screed thickness and access. HDB limits noisy works to 9am–5pm on weekdays and no more than three consecutive days, so larger jobs may be split.
If the existing tiles are sound and level, overlaying new tiles or vinyl, or applying an epoxy coating, can be quicker, quieter and cheaper. HDB allows overlays within a thickness limit, so ask your contractor whether an overlay works for your floor.
Hacking a kitchen? Kitchen hacking in Singapore covers the wet area rules, gas pipes and timeline.
We handle hacking services across Singapore, with a free site survey and an itemised quotation. See hacking services, or WhatsApp us photos of the unit.
Send photos, the floor plan and your handover date. Site surveys are free and every quotation is itemised.
Can’t see yours? Send it on WhatsApp with a photo of the unit.
Published guides put hacking and disposal at about S$3 to S$8 per sq ft, and homes are often quoted per job. A site visit is needed for an exact price.
Often two to four working days for a typical HDB flat, within HDB’s weekday noisy-work hours.
In HDB flats, bathroom floor finishes can only be replaced after three years from the block’s completion, with proper waterproofing.
Usually, because there’s no demolition or disposal. It only works if the existing floor is sound and within HDB’s thickness limit.
We’ll reply with an initial estimate and a time for a free site survey.